Carlisle, MA - USA
This is the current list of trail work identified; tasks without dates have not yet been scheduled
Work |
Date - Time |
Meeting Place |
Workers |
Status |
Notes |
Acton Link Trail. | 11/17/2013 9:00AM | Spencer Brook | Trails Committee | Stone wall at lot line to be opened up | |
Replace broken board on the boardwalk just off Bellows Hill Road, on the short trail that links to the Rockstrom Trail. | 10/26/2013 | Bert | Done | ||
Cut down the dead tree leaning over the Rockstrom Trail not far from School Street. | 10/26/2013 | Bert | Done | ||
Cut new trail at Greenough Land near Maple Street. |
10/20/2013 9:00AM |
Greenough main parking lot | Trails Committee | Done | |
Trailhead signs for Hanover Trail. | Steve, Alan | Signs painted; to be installed | |||
Clearing entrance to Benfield Platform. | 10/5/2013 | Alan | Done | ||
Install bench on River Trail boardwalk. | 9/28/2013 | Alan, Steve, Warren, Marc, Bert, Louise | Done | ||
Repair bridge on Towle Land - near Bingham connector link. | 9/28/2013 | Alan, Steve, Warren, Marc | Done | ||
River Trail Bridge at Piggery Rd. East side sagging badly at 2 posts with one beam completely off the post. We're going to need to get to this before long, and it ain't gonna be easy... |
|
|
reported by Marc, April 3, and confirmed by Kevin, April 17, 2009 |
||
2 trees down in the Davis corridor, one 18" pine on the trail in from Two Rod, another 10" pine near the intersection of Davis and Link trails. |
04/18/2009 |
George, Henry and Matt |
Done |
Reported by Kevin, April 16, 2009 |
|
2 trees down on Two Rod Road, one just south of the Davis corridor junction and the other just south of the Sachs Greenway intersection. |
|
|
Done | Reported by Dejan, Jan 3, 2009 |
|
Trees down on Greenough/redpine trail |
Reported by Henry/ 3 December |
||||
Remove fence posts in GMNWR | 04/01/2007 - 08:00am | O'Rourke Barn | Trails Committee | partial | Ongoing project |
Remove barbed wire at GMNWR and Greenough border | 04/22/2007 - 08:00am | Parking by bridge on Maple St. | Trails Committee | partial | Ongoing project |
Install post & TRAIL sign at Bisbee field edge | |||||
Install post with blue cross at Cranberry Bog by beaver pile | |||||
Install TRAIL sign on tree at Banta Davis at road crossing | |||||
Use salvaged metal posts to tie floating boardwalks in place |
foss/GMWR |