Work
|
Date - Time
|
Meeting Place
|
Workers
|
Status
|
Notes
|
Set sign post at cranberry bog |
04/01/2007 - 11:00am |
Cranberry bog |
Trail Committee |
done |
|
Cut trees blocking trails - Estabrook, Great Brook, Greenough |
04/01/2007 - 11:00am |
O'Rourke Barn |
Trail Committee |
done |
|
Walk potential trail between Greenough/GMNWR |
04/22/2007 - 09:00am |
Parking by bridge on Maple St. |
Trail Committee, representatives from Land Stewards |
done |
|
Tree down across trail, about 18" diameter |
4/24/07 - 5:00pm |
100 yards south of Wolf Rock on western portion of Tophet Loop |
Steve |
done |
Reported by Kevin - 978-318-7919 |
trees down |
|
Davis corridor - between top of hill and Prospect street turnoff |
random passer-by?
|
done |
reported by Henry |
Town forest - about 13 "chain-saw" trees down |
4/28/07 |
Biggest trees are on the south-side trail, but there are trees down throughout. |
Trail committee |
done |
reported by Kevin. |
2 small trees down |
5/8/07 |
Rockstrom - one near Bert's bride, one toward Bartlett Farm. Hand saw work. |
Got the one near Bert's bridge. Didn't find the Bartlett farm one, although there was one cut near the brook crossing. Kevin |
done |
reported by Steve |
Tree down |
5/12/07 |
Malcolm Meadows Loop, lower side. Crown in trail - small stuff, but lots. |
Kevin |
done |
reported by Steve |
Blue car fender next to trail |
5/8/07 |
Halfway down Poole Swamp trail |
Got it. It's going to the transfer station on Thursday unless anybody wants it! |
done |
reported by Steve |
large pine + smaller oak down on trail from Lowell Road to Old Morse road
|
5/12/07 |
Chainsaw size pine about 15m from Lowell road - on the branch closer to the town center (i.e., left fork upon leaving Lowell Road)
Hand saw size Oak on same branch - very close to where it meets the other branch (i.e., close to the driveway)
|
Got the small oak and a small pine close to the end of the trail, but not the large pine. Based on a conversation with George, the State Park wants to do this work themselves. Kevin |
done |
Reported by Henry
|
Bartlett Farm Boardwalk |
05/27/2007 |
Brook crossing |
Trail Committee and volunteers |
done |
Design by Marc |
Boardwalks floated out-of-place |
6/17/07 |
along trail from Foss to Beaver Bridge
along cutoff trail from river to Beaver Bridge
Along trail from Greenough Dam to river |
Riverfest walkers |
Done |
reported by Henry |
Trail clearing along trail east of driveway from lower Little League Field to upper Soccer Field. Clear entrance to trail across from lower Little League Field parking lot (rest of trail behind cemetary should be clear but could use a double check). Tools needed include loppers, swing blade, and small handsaw. |
6/16/07 |
Banta Davis Trails |
Steve + Evan, Zach, Alec from Earth Science |
Done |
Reported by Marc |
Oak tree about halfway down the trail from the Greenough dam to the river. About 8" diameter. |
6/9/07 |
River trail |
Kevin |
Done |
Reported by Kevin |
Lots of flotsam along the River Trail and connector to Red Tail, medium maple down between first two long river trail Foss/GMWR boardwalks
|
|
|
|
Looks done
|
Reported by Steve |
beaver deceiver adjustments: letting out more water than we want:
- requires some discussion. Upon investigation/reflection, there is more water in the beaver pond than there was when the upper deck was originally installed - but about 10" less than there was a month ago.
- the family of ducks in the pond this morning seemed perfectly happy with the level.
|
|
|
|
void...I think we are happy with what we have
|
|
Large pine across the trail in Town Forest on back trail, near corner of Ray Watson's land. |
8/11/07 |
Town Forest |
Looks like someone got to that between last Tuesday and today (8/11/07). There were another 3 trees down on the trail that heads to the swamp in the north-east corner, and I got those. As far as I know, there is no more tree work to be done in town forest. Kevin |
Done |
reported at OHD |
8" white oak down across 3rd River trail boardwalk (1st bridge after Piggery road, going toward Greenough)
|
25 August |
|
|
done |
Reported by Henry
|
Replace deck on small Towle boardwalk
|
|
|
Steve & Henry
|
Done - 30 November
|
|
Bridge ditch at Greenough |
|
|
Henry, Matt, Erin |
Done - 18 November |
|
1 large pine + 1 10" oak |
|
Between cell tower and woodward Meadow
|
|
25August: cut & partially rmoved the smaller tree.
1Nov: someone got them earlier this week.
|
reported by Henry |
2 broken boards - River Trail bridge closest to Greenough |
11 October |
River Trail |
|
Done (25 Nov) |
reported by Henry |
Boardwalk construction in Davis Corridor |
11/03/2007 - 09:00am |
Malcom Meadows parking |
Trails committee and volunteers |
Done (25 Nov) |
http://carlisletrails.pbwiki.com/ |
Boardwalk construction on Towle near Bingham Rd |
11/04/2007 - 09:00am |
Bingham Street |
Trails committee and volunteers |
Done (10 Nov) |
http://carlisletrails.pbwiki.com/ |
2- 10" oak blowdows at either end of Turtle trail
another 100' along the trail going south of the meadow
|
6 July, 9:30AM
|
|
|
Done |
Reported by Warren Lyman (5 July)
|
tree down near Bingham road end of Towle trail
|
|
|
|
Done |
reported by Mary Zoll, 13 August 08
|
10" pine down on F&W trail adjacent to Woodward trail
(about 30' from "no dogs" sign closest Maple St)
|
|
|
|
done |
reported by Henry
13 August 08
|
2 trees to cut on Malcolm Meadows outer loop. Not huge but big enough for chain saw.
|
Aug 15, 12:00pm
|
|
|
Done |
reported by Kevin 13 Aug 08
|
12" tree (pine?) down on spur trail, near Banta-Davis porta-potties.
|
Sept 24, 1:20pm
|
|
|
Done |
Reported by Mary Zoll, 3 Sept 08
|
Large rotted tree (20") down on Two Rod Road near cutoff to Malcolm Meadows Loop
|
Sept 24, 1:00pm
|
|
|
Done |
Reported by Kevin, 9/18/08
|
14" pine down on FWS land, on trail leading to Woodwards from the Tobin Bridge. Tree is abotu 50m past the long boardwark on the left branch of the bypass
|
|
GMNWR |
|
Done (kevin/george?)
|
reported by Henry, 2 Nov 08
|
rope broken on Beaver bridge (again)
|
28 Nov/08 |
|
|
replaced rope
|
reported by Henry (broke again, at post)
|
10" oak down across River Trail bridge (closest to Greenough)
5 grey choicedek boards broken
|
4 July 08, 1-3PM
|
O'rourke barn
|
Henry + Richard Ketchen
|
Done
(replaced 6)
|
Reported by Henry
23 June 08
|
Comments (0)
You don't have permission to comment on this page.