Trail Work

 

 

This is the current list of trail work identified; tasks without dates have not yet been scheduled  

 

Work

Date - Time

Meeting Place

Workers

Status

Notes

River Trail Bridge at Piggery Rd. East side sagging badly at 2 posts with one beam completely off the post. We're going to need to get to this before long, and it ain't gonna be easy...
 
     
reported by Marc, April 3, and confirmed by Kevin, April 17, 2009
2 trees down in the Davis corridor, one 18" pine on the trail in from Two Rod, another 10" pine near the intersection of Davis and Link trails.
 04/18/2009
  George, Henry and Matt
 Done
 reported by Kevin, April 16, 2009
 2 trees down on Two Rod Road, one just south of the Davis corridor junction and the other just south of the Sachs Greenway intersection.
 
   
Done  reported by Dejan, Jan 3, 2009

 Trees down on Greenough/redpine trail
one is about 10" diameter - all pines

         Reported by Henry/
3 December
 Remove fence posts in GMNWR  04/01/2007 - 08:00am  O'Rourke Barn  Trail Committee  partial  ongoing project
Remove barbed wire at GMNWR and Greenough border 04/22/2007 - 08:00am Parking by bridge on Maple St. Trail Committee partial ongoing project
 Install post & TRAIL sign at Bisbee field edge          
 Install post with blue cross at Cranberry Bog by beaver pile          
 Install TRAIL sign on tree at Banta Davis at road crossing          
 use salvaged metal posts to tie floating boardwalks in place
   foss/GMWR      

 

See Work Completed page

 